| Plant Meeting Crashing on build 5.0.0.12014 Reporter: Aleksandar Dimitrijevic Example: https://qatesting.shoplogix.com/whiteboard/#/plantlevellinemeeting/area/7/ Console error when on Plant Meeting view: Data doesn't seem to be rendered completely and cannot go to Settings. Note: The issue wasn't reproducible on build 5.0.0.11904. |
| Cycle and Production Block issues in Shift Line / Plant Level Meeting as of build 5.0.0.12004 Reporter: Aleksandar Dimitrijevic Ex. ShiftLine: https://qatesting.shoplogix.com/whiteboard/#/shiftline/FFD4D9CF-EFAA-ED58-0298-AD1A4F13C386/start/20200219T084741.000/gauge1=1&gauge2=8&gauge3=2&timeMetric=0&cycleDP=1&cycleTOL=0&gaugeTOL=0&overCycling=0&goalgreen=1&goalyellow=0.75&goalred=0.5&scrapgreen=0.02&scrapyellow=0.05&scrapred=0.1 Ex. Plant Level Meeting: https://qatesting.shoplogix.com/whiteboard/#/plantlevellinemeeting/area/5/start/2020-02-19T07:00:00.000/end/2020-02-19T15:00:00.000/snaptoshift=false&goalgreen=1&goalyellow=0.75&goalred=0.5&scrapgreen=0.02&scrapyellow=0.05&scrapred=0.1&cycleTOL=0&gaugeTOL=0&cycleDP=0 In Shift Line view Cycle gauge is blank. In addition, on build 5.0.0.11960 Cycle (which can be verified on Plant Meeting view) and Production Block values are different from values on build 5.0.0.12004, although they should be same (5.0.0.11960 should be correct one based on https://slxdev.atlassian.net/browse/PNE-670). Shift Hours on 5.0.0.11960 Shift Hours on 5.0.0.12004 Plant Level Meeting on 5.0.0.11960 (Line 15) Plant Level Meeting on 5.0.0.12004 Note: On build 5.0.0.11990 I couldn't load Shift Line or Plant Level Meeting, so it could be that is the version which introduced the bug. |
| OEE Waterfall is not working on IE 11 Reporter: Aleksandar Dimitrijevic
Description Steps to reproduce: In config file add <OeeWaterfallEnabled>1</OeeWaterfallEnabled> on any Area with <Plant>1</Plant> In Internet Explorer navigate to Whiteboard Homepage > Select Plant where OEE Waterfall is enabled > Select OEE Waterfall
Expected Result: OEE Waterfall is rendered with correct results Actual Result: OEE Waterfall page is blank |
| Numerator and OEE gauge in Shift Line are incorrect Reporter: Aleksandar Dimitrijevic Description
Numerator and OEE gauge in Total section of Shift Line are incorrect. Ex: Shift Line: https://qatesting.shoplogix.com/whiteboard/#/shiftline/FFD4D9CF-EFAA-ED58-0298-AD1A4F13C386/start/20200219T141455.000/gauge1=1&gauge2=8&gauge3=0&timeMetric=0&cycleDP=1&cycleTOL=0&gaugeTOL=0&overCycling=0&goalgreen=1&goalyellow=0.75&goalred=0.5&scrapgreen=0.02&scrapyellow=0.05&scrapred=0.1&units=3 Numerator in Shift Line total should be sum of good production from all End of Line machines. Expected Numerator (sum of all Good Production from End of Line machines) = 27178 Actual Numerator = 67260 Expected OEE Gauge value = 68%
Actual OEE Gauge value = 77%
2020-04-06 - Discussed with Aleksandar Dimitrijevic (Unlicensed) , ratio below OEE gauge is good & expected production, and it does not equal the OEE Bottleneck machine: https://qatesting.shoplogix.com/whiteboard/#/shifthours/FFD4D9CF-EFAA-ED58-0298-AD1A4F13C386/start/20200219T070000.000/gauge1=1&gauge2=8&gauge3=0&timeMetric=0&cycleDP=1&cycleTOL=0&gaugeTOL=0&overCycling=0&goalgreen=1&goalyellow=0.75&goalred=0.5&scrapgreen=0.02&scrapyellow=0.05&scrapred=0.1&units=3 EoL 1: https://qatesting.shoplogix.com/whiteboard/#/shifthours/E570F0B2-2E93-92ED-9CAE-AD171B401DFA/start/20200219T070000.000/gauge1=1&gauge2=8&gauge3=0&timeMetric=0&cycleDP=1&cycleTOL=0&gaugeTOL=0&overCycling=0&goalgreen=1&goalyellow=0.75&goalred=0.5&scrapgreen=0.02&scrapyellow=0.05&scrapred=0.1&units=3 EoL 2: https://qatesting.shoplogix.com/whiteboard/#/shifthours/76FF2128-2DF6-382A-0ED7-AD1CAFC21B52/start/20200219T070000.000/gauge1=1&gauge2=8&gauge3=0&timeMetric=0&cycleDP=1&cycleTOL=0&gaugeTOL=0&overCycling=0&goalgreen=1&goalyellow=0.75&goalred=0.5&scrapgreen=0.02&scrapyellow=0.05&scrapred=0.1&units=3 EoL 3: https://qatesting.shoplogix.com/whiteboard/#/shifthours/9AA9FA61-0908-66D7-EB56-AD1B43DD68B6/start/20200219T070000.000/gauge1=1&gauge2=8&gauge3=0&timeMetric=0&cycleDP=1&cycleTOL=0&gaugeTOL=0&overCycling=0&goalgreen=1&goalyellow=0.75&goalred=0.5&scrapgreen=0.02&scrapyellow=0.05&scrapred=0.1&units=3 In addition, scrap value in Shift Line total section is incorrect. Case 1: If sum of good production from all End of Line machines is less then good production from Bottleneck machine, the difference should show as Scrap in Shift Line. This is what we have in the example above and Scrap should be 768. Case 2: If sum of all good production from End of Line machines is greater then good production from Bottleneck machine, the difference should show as Excess Good in Shift Line. In both cases OEE gauge should be Sum of Good Production from all End of Line machines divided by Expected Production. If anything is unclear, please contact Aleksandar Dimitrijevic (Unlicensed) or Jesse Hildebrand (Unlicensed) |
| Slider edit is not rounding scrap Reporter: Joseph Kingry Expected Result Slider edit should increase/decrease values in integer numbers Actual Job/Sub-Job Total is not rounded when picking Job/Sub-Job Prerequisite Running 1 job with 2 sub-jobs or 2 Jobs no sub-jobs with decimal cycle factor Reproduction Click on running state for hour with 2 jobs or multiple sub-jobs Expected Result Total is rounded when picking job/sub-job |
| Rounding is creating excess scrap Reporter: Joseph Kingry Description
Prerequisite: Running 1 job with 2 sub-jobs with odd number as total production for the hour Click on running state in the hour with odd number as total production (e.g 101) Select sub-job 1 > Set all production to scrap (51) > Save Click on running state in the hour with odd number as total production Select sub-job 2 > Set all production to scrap (51) > Save Expected Result: Rounding for sub-job 1 should be as is (51), however for sub-job 2, it should take total production - assigned scrap for sub-job 1 (101-51=50) Actual Result: Scrap for sub-job 1 = 51; Scrap for sub-job 2 = 51; Excess Scrap = 1 |
| Action Plan icons (Archive, Delete, etc.) appear as disabled when they are actually active Reporter: Steven Arrol Description To be assigned to when it comes through the Kanabn Issue: The appearance state of the archive/delete buttons appears greyed out / light-opacity, as though it is not clickable. Users may not realize these buttons are active and available to them. Steps to reproduce: User goes into Action Plan portal User selects >=1 action plan record in the table row using the left-side checkboxes User hovers over Archive or Delete buttons
Expected Result: Actual Result: |
| Null Exception State Data Export API Reporter: Anthony Scaletti |
| Cannot add variables in New Config Reporter: Aleksandar Dimitrijevic Steps to reproduce:
Go to new config
https://<ServerID>.shoplogix.com/peconfig/#/ Select any machine > Select Variables tab > Edit Select 'Scrap' in drop down Select 'Add Variable'
Expected Result: New variable is added Actual Result: New variable is not added The same bug is replicated for the following variables: Scrap Event Setup Stop Generic
|
| Blocked Cavity - Job Dialog issues Reporter: Aleksandar Dimitrijevic Description Issue # 1 Steps to Reproduce: Go to any machine > Job List Select any Default or Scheduled job Change Blocked Cavities value > Save Select the same Default / Scheduled job again
Expected Result: Blocked Cavity value is changed Actual Result: Blocked Cavity value is NOT changed Issue # 2 Steps to Reproduce: Go to any machine > Job List Select any job with sub-jobs --> Blocked Cavities option is not displayed which is expected Close Select another job without sub-jobs or click on New Job
Expected Result: Blocked Cavities is displayed in job dialog Actual Result: Blocked Cavities is NOT displayed in job dialog Issue # 3 |
| Blocked is not displayed in Shift Roll Up Total section Reporter: Aleksandar Dimitrijevic |
| New Config - issues with Variables Reporter: Aleksandar Dimitrijevic Description
Changing Variable Type while Variable Edit is open crashes peconfig Steps to reproduce: Select any machine > Variables > Edit > Click on Edit sign at the end of Variable row > Change Variable Type outside of Variable Edit screen
Expected behavior: Variable Type is changed Actual behavior: Blank page is displayed Time Given (min) is not saved in Downtime, Setup, Scrap, Event, Setup Stop variables Steps to reproduce: Select any machine > Variables > Variable Type = Downtime > Edit > Click on Edit sign at the end of Variable row > Enter ‘Time Given (min)’ > Save > Refresh Select the same machine > Variables > Variable Type = Downtime > Edit > Click on Edit sign at the end of Variable row
Expected behavior: ‘Time Given (min)’ is saved Actual behavior: ‘Time Given (min)’ is not saved Count Type = Cumulative Count is not saved Steps to reproduce: Select any machine > Variables > Variable Type = Scrap > Edit > Click on Edit sign at the end of Variable row > Set Count Type = Cumulative Count > Save > Refresh Select the same machine > Variables > Variable Type = Scrap > Edit > Click on Edit sign at the end of Variable row
Expected behavior: Count Type = Cumulative Count Actual behavior: Count Type <> Cumulative Count Note: There is also a typo ‘Cummulative’ should be ‘Comulative’ Steps to reproduce: Select any machine > Variables > Variable Type = Generic > Edit > Click on Edit sign at the end of Variable row > Enter value for Target, Standard Deviation and Style > Save > Refresh Select the same machine > Variables > Variable Type = Generic > Edit > Click on Edit sign at the end of Variable row
Expected behavior: Target, Standard Deviation and Style values are saved and displayed. Actual behavior: Target, Standard Deviation and Style values are NOT saved and displayed. |
| New Config - issues with Machine States Reporter: Aleksandar Dimitrijevic ONE
Steps to reproduce: Select any machine > Machine States > Edit > Click on + sign next to Slow Running/Micro Stoppage > Make any change > Save
Expected behavior: Changes are saved successfully Actual behavior: Changes are not saved TWO Steps to reproduce: Select any machine > Machine States > Edit > Click on + sign next to Micro Stoppage > Turn off ‘Accept Automatic Reasons’, ‘Accept User Reasons’ and ‘Accept Machine Reasons’
Expected behavior: Checkboxes are turned off Actual behavior: Checkboxes stay turned on THREE Steps to reproduce: Select any machine > Machine States > Edit > Click on + sign next to Automatic Setup Change ‘Setup Stop Condition’ to ‘Production Threshold’ > Enter ‘Production Threshold’, change selection for ‘Automatic Reason Override’ and ‘Enforce Status Reasons’ > Save Refresh > Select the same machine > Machine States > Edit > Click on + sign next to Automatic Setup
Expected behavior: Changes are saved Actual behavior: Changes are not saved FOUR Steps to reproduce: Select any machine > Machine States > Edit > Click on + sign next to Slow Running/Micro Stoppage > Click on Production Override
Expected behavior: All 4 options can be selected Actual behavior: Only first 2 options can be selected Workaround: Use arrows on keyboard to navigate to rest of the options FIVE Steps to reproduce: Select any machine > Machine States > Edit > Click on + sign next to Slow Running > Click on Production Override > Select ‘All Good’
Expected behavior: ‘All Good’ is displayed as selected option Actual behavior: ‘CountAsProduction’ is displayed as selected option Note: All Scrap = CountAsScrap; All Zero = RemoveFromCount |
| Shift Line - Denominator is not correct due to Unit Conversion | | Undo commented out code in CustomAuthentication.cs Reporter: Aleksander Description Ex: https://qatesting.shoplogix.com/whiteboard/#/shiftline/FFD4D9CF-EFAA-ED58-0298-AD1A4F13C386/start/20200219T132642.000/gauge1=1&gauge2=8&gauge3=0&timeMetric=0&cycleDP=1&cycleTOL=0&gaugeTOL=0&overCycling=0&goalgreen=1&goalyellow=0.75&goalred=0.5&scrapgreen=0.02&scrapyellow=0.05&scrapred=0.1&units=3 https://qatesting.shoplogix.com/whiteboard/#/shifthours/FFD4D9CF-EFAA-ED58-0298-AD1A4F13C386/start/20200219T070000.000/gauge1=1&gauge2=8&gauge3=0&timeMetric=0&cycleDP=1&cycleTOL=0&gaugeTOL=0&overCycling=0&goalgreen=1&goalyellow=0.75&goalred=0.5&scrapgreen=0.02&scrapyellow=0.05&scrapred=0.1&units=3 Note: Running job on bottleneck machine have Line Cycle Factor <> Cycle Factor and Units are set to Line. |