The following table shows how items in the quick view are calculated:
Quick View | Machine Status | Key Numbers (Parts) | Duration | Equation | Math Calculation | Description |
---|---|---|---|---|---|---|
| Uptime | 97 | 30.1 mins |
| 97 = 3.158 * 30.1 + 3 -1 | Produce 97 parts in running state/uptime. No downtime issues happening in this duration |
Downtime | 76 | 24 mins |
| 76 = 3.158 * 24 | It should have produced 76 parts but failed. Micro-stoppage and idle status are triggered in this period | |
Unscheduled | 18 | 5.9 mins |
| 18 = 3.158 * 5.9 | Unscheduled production values (18 parts) | |
| Opportunity | 77 | 24.3 mins |
| 77 = 3.158 * 24.3 | It shows the extra capacity (77 parts) which can be considered to maximize the total production |
Scrap | 1 | 18 sec | Scrap values added manually | N/A | Bad parts, reported by customers |
Info |
---|
Technically, we assume Runspeed is a fixed value for all periods. |
The following table shows how the values in the OEE gauge and the Cycle Gauge are calculated.
Gauge Type | Quick view | Description |
---|---|---|
OEE |
| Numerator = 97 = 3.158 * 30.1 + 3 -1 Denominator = 171 = 97 + 77 - 3
57% = 97 / 171 |
Cycle | Numerator = 18.5 = (30.1 / 97) * 60 Denominator =
|
Example 3: Production without Jobs
...
If a machine is not running on a job, the way calculations are done changes. In this case, the Machine Rate (prod/min)
can be found in the PEConfig settings. For this example, the Machine Rate (prod/min) = 180
Quick View | Machine Status | Key Numbers (Parts) | Duration | Equation | Math Calculation | Description |
---|---|---|---|---|---|---|
| Uptime | 5632 | 55.7 mins |
| 5632 = 180 * 55.7 - 4387 | Produce 5632 parts in running state/uptime. |
| Downtime | 781 | 4.3 mins |
| 781 = 180 * 4.3 | It should have produced 781 parts but failed. Idle status are triggered in this period. |
Opportunity | 781 | 4.3 mins |
| 781 = 180 * 4.3 | Opportunity production values (781). |
Gauge Type | Quick view | Description |
---|---|---|
OEE |
| Numerator = 5632 = 180 * 55.7 - 4387 Denominator = 10800 = 180 * 60
52% = 5632 / 10800 |
Availability |
93% = 56 / 60 | |
Performance |
5632 = 180 * 55.7 - 4387
56% = 5632 / 10019 | |
Quality Ratio |
5632 = 180 * 55.7 - 4387
100% = 5623 / 5623 |
Tip |
---|
Different approaches to OEE calculation in this case