Configuration
This is a configurable option in the Quality Controller, which is located at https://yourserver.shoplogix.com/qualitycontoller/, for example: https://demo.shoplogix.com/qualitycontroller/:
...
Clicking on the banner for Active Checks will display all the configured active checks (meeting the stage condition) in a checklist format. If all Active Checks have been submitted, the banner will display Active Checks: 0 until Active Checks are triggered again according to their stage. Ad Hoc Checks will always show the count of enabled ad hoc checks as these are always available.
Active Checks
...
Info |
---|
The status of the checks can be found in the group number and the number will be updated as checks are completed. For example above 2 Active (production) checks are expected and 0 of them are complete. As the checks are completed the number 0 will increment. The 2 checks are are configured are reset depending on how the check is configured in the quality controller (job/shift/day/production). |
Ad Hoc Checks
...
Info |
---|
Note that the denominator of the group of checks being displayed (in the example above 2) is displaying the number of active checks configured for this group. This number is NOT the number of expected checks since there is no expected number for adhoc checks. This is meant for the user to know how many ad hoc checks are configured for the group. The top number is the checks that have been completed for the current shift/job. The top numerator number will reset on a shift OR job change. |
Group Colour Key
Group Color | Meaning | ||||||
---|---|---|---|---|---|---|---|
| One or more checks in the group have failed | ||||||
| All of the checks in the group have passed | ||||||
| Display for a group of ad hoc checks | ||||||
| Display for a group of active checks |
Completed and Expired Checks
...
The full list of completed checks are available in the Audit view. A short list of recently* completed checks will appear for each group.
...