Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

The Meeting view displays each shift within the chosen time period, machine chronological report, production count bars, and different gauges. It defaults to a 24 hour period. This view is very similar to Machine Chrono. More information can be found in 4.3 Machine Chrono.

...

Figure 5-33: Meeting View

...

Figure 5-34: Hourly view from clicking Meeting view title

The settings for this view are the same as Machine Chrono, all the steps are described in section 4.3. Job Bar Color, Job Identifier and Metrics at the top of the Machine Chrono view will change as follows:

Green is when the job has been completed.

...

Figure 5-35: Machine Chrono View with a Green Job Identifier

Blue is when the current job target has not been met.

...

Figure 5-36: Machine Chrono View with a Blue Job Identifier

Orange is when the current job target has been exceeded.

...

Figure 5-37: Machine Chrono View with a Orange Job Identifier