Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

The Quality Configuration allows users to set up groups of manual checks tied to operations set up in the main Shoplogix Configuration. This documentation will give you a detailed overview of each component of the Quality Configuration and how they operate.PIC OF ENTIRE PLATFORM

...

Save/Reset:

...

If there are unsaved changes, it will be displayed. You can Save the Quality Configuration here, or Reset all unsaved changes.

...

The Manual Inspections Container allows users to set up and configure all the manual inspections that are to be triggered if all the configured Job Rules are met on the current running job. You can duplicate and delete groups of Manual Inspections.

Fields:

  • Active: Checks only get triggered if this setting is true, otherwise they will never activate.

  • Order: This is the order that this check will appear in Whiteboard once checks are triggered.

  • Name: Name of the check.

  • Type: Type of the check, can be one of: PassFail, Measurement, OR String.

  • Low: Lower limit of passing threshold.

  • High: Upper limit of passing threshold.

  • Target: Expected target of check value.

  • Std Dev: ExpectedStandard Deviation.

  • SPC: The check is designated as an SPC variable.

  • Critical: Once the check is triggered, the pop up cannot be hidden until this check is completed.

  • Stage: Designates when this check gets triggered. List of valid Stages below.

  • Quantity: Only available if the Production Stage is selected. The number of parts produced before this check triggers.

  • Hyperlink: A valid URL with an image or PDF to work instructions to be displayed when this check triggers.

...