Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

The following table shows how items in the quick view are calculated:

Quick View

Machine Status

Key Numbers (Parts)

Duration

Equation

Math Calculation

Description

 

Image Modified

Uptime

97

30.1 mins

Uptime parts = Runspeed (Parts/mins) * Uptime Duration (mins)+ Running Type (Gain) - Scrap Parts

97 = 3.158 * 30.1 + 3 -1

Produce 97 parts in running state/uptime. No downtime issues happening in this duration

Image Modified

Downtime

76

24 mins

Downtime parts = Runspeed (Parts/mins) * Downtime Duration (mins)

76 = 3.158 * 24

It should have produced 76 parts but failed. Micro-stoppage and idle status are triggered in this period

Image Modified

Unscheduled

18

5.9 mins

Unscheduled parts = Runspeed (Parts/mins) * Unscheduled Duration (mins)

18 = 3.158 * 5.9

Unscheduled production values (18 parts)

Image Modified

 

Opportunity

77

24.3 mins

Potential parts = Runspeed (Parts/mins) * Opportunity Duration (mins)

77 = 3.158 * 24.3

It shows the extra capacity (77 parts) which can be considered to maximize the total production

Image Modified

Scrap

1

18 sec

Scrap values added manually

N/A

Bad parts, reported by customers

Info

Technically, we assume Runspeed is a fixed value for all periods.

The following table shows how the values in the OEE gauge and the Cycle Gauge are calculated.

Gauge Type

Quick view

Description

OEE

Image Modified

 

Numerator = Good Production = Uptime parts = Runspeed (Parts/mins) * Uptime Duration (mins)+ Running Type (Gain) - Scrap Parts

97 = 3.158 * 30.1 + 3 -1

Denominator = Expected Goal = Uptime Parts + Opportunity Parts - Running Type (Gain)

171 = 97 + 77 - 3

OEE = Good Production / Expected Goal

57% = 97 / 171

Cycle

Image Modified

Numerator = Production time = (Uptime Duration / Uptime Parts) * 60 (Unit conversion) in seconds

18.5 = (30.1 / 97) * 60

Denominator = Scheduled Cycle time

Cycle time = 18.999 = 19.0 s (See job window)

Variance = 18.5s - 19.0s = -0.5s

Example 3: Production without Jobs

...

If a machine is not running on a job, the way calculations are done changes. In this case, the Machine Rate (prod/min) can be found in the PEConfig settings. For this example, the Machine Rate (prod/min) = 180

Quick View

Machine Status

Key Numbers (Parts)

Duration

Equation

Math Calculation

Description

 

Image Modified

Uptime

5632

55.7 mins

Uptime parts = (Machine rate * Uptime) - Running Type (Loss)

5632 = 180 * 55.7 - 4387

Produce 5632 parts in running state/uptime.

Image Modified

 

Downtime

781

4.3 mins

Downtime parts = Machine rate * Downtime Duration

781 = 180 * 4.3

It should have produced 781 parts but failed. Idle status are triggered in this period.

Image Modified

Opportunity

781

4.3 mins

Potential parts = Machine rate * Opportunity Duration

781 = 180 * 4.3

Opportunity production values (781).

Gauge Type

Quick view

Description

OEE

Image Modified

 

 

Numerator = Good Production = Uptime parts = (Machine Rate * Uptime) - Running Type (Loss)

5632 = 180 * 55.7 - 4387

Denominator = Expected Goal = Machine rate * Planned Productive Time

10800 = 180 * 60

OEE = Good Production / Expected Goal

52% = 5632 / 10800

Availability

Image Modified

Availability = Uptime / Planned Productive Time

Uptime = 55.7 = 56 mins

Planned Productive Time = 1 hr = 60 mins

93% = 56 / 60

Performance

Image Modified

Performance = ( # of parts produced) / (Machine Rate * Uptime)

# of parts produced = Uptime production = (Machine Rate * Uptime) - Running Type (Loss)

5632 = 180 * 55.7 - 4387

Machine Rate * Uptime = 180 * 55.7 = 10019

56% = 5632 / 10019

Quality Ratio

Image Modified

Quality Ratio = [(Number of parts produced) - (Number of parts rejected)] / (Number of parts produced)

# of parts produced = Uptime production = (Machine Rate * Uptime) - Running Type (Loss)

5632 = 180 * 55.7 - 4387

Number of parts rejected = Scrap = 0

100% = 5623 / 5623

Tip

Different approaches to OEE calculation in this case

OEE = Availability * Performance * Quality Ratio = 93% * 56% * 100% = 52%

OEE = Good Production(pcs)/(Expected speed(parts/hr)* Scheduled Time(hr)) = 5632 / (180 * 60) = 52%

Generally you can choose either of them to calculate OEE. They both work in SLX system.

...