How to Use the Machine Chrono/Hour-by-Hour Whiteboard
The Machine Chrono screen displays the machine chronological report, production count bars, and different gauges. The default configuration is a 60-minute window divided into five minute gaps, which can be changed in the settings menu.
Figure 5-21: Machine Chrono View with Settings, Navigation, and Arrows Highlighted
Similar to the Area Level Whiteboard, in this view there are three ways to navigate to a different time period.
Use the left and right arrows to move backwards or forwards in time.
Use the double right arrow to move to the current time period.
Click on the Settings Icon in order to specify a certain date.
From this view, you can navigate to the Machine Level Whiteboard by clicking the [name-date-hour] header and other view options by clicking the Navigation Bar.
Figure 5-22: Machine Chrono View with the Navigation bar and Machine Level Whiteboard Highlighted
The Job Bar Color, Job Identifier and Metrics at the top of the Machine Chrono view will change as follows:
Green is when the job has been completed.
Figure 5-23: Machine Chrono View with a Green Job Identifier
Blue is when the current job target has not been met.
Figure 5-24: Machine Chrono View with a Blue Job Identifier
Orange is when the current job target has been exceeded.
Figure 5-25: Machine Chrono View with a Orange Job Identifier